220 kV switchyard in HPP Ambuklao

– complete electrical design (primary and secondary) for 220 kV switchard
– for client: Andritz Hydro Vienna
– year 2008.-2009.

220 kV switchyard, HPP Chacayes, Chile

– primary electrical design and steel structures for 220 kV switchyard
– for client: Andritz Hydro Vienna
– year 2010.

400/110 station at HPP Velebit

– Main, primary and secondary electrical design for 400 and secondary design for 110 kV part for the new 110 kV GIS and new 400/110 kV transformer
– for client: HOPS (TSO)
– year 2022 – 2023

S/S 110/35 kV Požega reconstruction

– Preliminary design for reconstruction 110/35 kV – GIS and AIS variant
– for client: HOPS (TSO)
– year 2023 – ongoing

S/S 220/110/30/10 kV Bilice DG

– Detailed design for installation of Diesel generator in SS Bilice 220/110/30/10 kV
– for client: HELB d.o.o.
– year 2023 – ongoing

S/S Nafoora

– Complete main earthing design including all studies
– year 2022

UW 110/20 kV Matrei

– Detailed secondary schematics design, including As-Built
– for client: Siemens Energy Austria GmbH
– year 2023 – ongoing

UW 110/30/20 kV Güssing

– Main and detailed electrical design 110/30/20 kV substation
– for client: Cteam Energietechnik GmbH
– year 2023 – ongoing

UW Frauenkirchen 110/30 kV

– Main and detailed electrical design 110/30 kV substation
– for client: Netz Burgenland
– year 2023 – ongoing

UW Wallern 110/30/20 kV

– Main and detailed electrical design 110/30 kV substation
– for client: Netz Burgenland
– year 2023 – ongoing