220 kV switchyard in HPP Ambuklao
– complete electrical design (primary and secondary) for 220 kV switchard
– for client: Andritz Hydro Vienna
– year 2008.-2009.
– complete electrical design (primary and secondary) for 220 kV switchard
– for client: Andritz Hydro Vienna
– year 2008.-2009.
– primary electrical design and steel structures for 220 kV switchyard
– for client: Andritz Hydro Vienna
– year 2010.
– Main, primary and secondary electrical design for 400 and secondary design for 110 kV part for the new 110 kV GIS and new 400/110 kV transformer
– for client: HOPS (TSO)
– year 2022 – 2023
– Preliminary design for reconstruction 110/35 kV – GIS and AIS variant
– for client: HOPS (TSO)
– year 2023 – ongoing
– Detailed design for installation of Diesel generator in SS Bilice 220/110/30/10 kV
– for client: HELB d.o.o.
– year 2023 – ongoing
– Complete main earthing design including all studies
– year 2022
– Detailed secondary schematics design, including As-Built
– for client: Siemens Energy Austria GmbH
– year 2023 – ongoing
– Main and detailed electrical design 110/30/20 kV substation
– for client: Cteam Energietechnik GmbH
– year 2023 – ongoing
– Main and detailed electrical design 110/30 kV substation
– for client: Netz Burgenland
– year 2023 – ongoing
– Main and detailed electrical design 110/30 kV substation
– for client: Netz Burgenland
– year 2023 – ongoing