References

2018
2018

TS 220/110/35kV Vrboran, Croatia

Complete secondary design for 110 kV part reconstruction Including auxiliary supplies reconstruction
2018

HPP Nam Theun 1, Laos

Complete primary design for 500 kV take-off yard Complete steel design for 500 kV take-off yard Coordination for 115 kV take-off yard
2018

TS 110/35/10 kV Dolinka, Croatia

Complete design for 10 kV part reconstruction Including primary, secondary and civil design
2018

S/S 35 kV Slavonija Slad, Croatia

Preliminary, Main and For Erection, electrical, civil and architectural design Including obtaining permits and official body approvals
2018

S/S 110/10(20) kV Zamet, Croatia

For erection design for 10(20) part Overall coordination for all transformer ducts, cabling and aux systems
2018

S/S 400/110 kV Lastva, Montenegro

As Built documentation After successful erection and energization of the substation For Client: Siemens Germany
2018

HPP Orlovac, Croatia

Design for replacement of auxiliary supply cabinets
2018

S/S 115 kV Xayaburi, Laos

Design for new 115 kV double-busbar switchyard at HPP Xayaburi, Laos For client: Andritz Hydro, Austria
2017
2017

SS Buje, Croatia

Design for new 35/20 kV transformer installation For client: Croatian Distribution System Operator (HEP ODS)
2017

SS Stenjevec, Croatia

Preliminary and Main design (cabling part) For client: RAVEL d.o.o.
2017

SS Oriovac, Croatia

Earthing system study in S/S 35/10(20) kV Oriovac For client: Croatian Distribution System Operator (HEP ODS)
2017

SS Orikum i TS Himare, Albanija

Insulation coordination study For client: KONČAR KET
2017

HPP Orlovac, Croatia

For erection electrical design for reconstruction 220 kV switchyard For client: Croatian Transmission System Operator (HOPS)
2017

HPP Nuble, Chile

construction requirements for transformer fixing and oil separation for client: Andritz Hydro Vienna
2017

400/110/35 kV substation Lastva, Montenegro

complete design for 400 kV and 110 kV GIS switchgear for client: Siemens AG Vienna
2016
2016

10/20 kV switchgear HRT – Croatian National television

detailed secondary design for client: Dalekovod-projekt
2016

420/132 kV substation Snilldal, Norway

Primtech design, for bidding, preliminary design level for client: Dalekovod-projekt
2016

Kosovo substations

AC/DC design for 15 substations for client: Siemens AG Vienna
2016

400/110 kV substation Ernestinovo, Croatia

preliminary primary electrical design, main secondary design for extension for client Croatian Transmission System Operator (HOPS)
2016

TPP Zagreb, Croatia

reconstruction of Block C, electrical part for client: Siemens Zagreb
2016

420/132 kV substation Snilldal, Norveška

3D visualization of the substation for client: Dalekovod-projekt
2016

HPP Xayaburi, Laos

anchor bolts design for block transformers fixing for client: Andritz Hydro Vienna
2016

HPP Xayaburi , Laos

primary electrical and gantry steel design for 500 kV take off yard for client: Andritz Hydro Vienna
2016

500/220 kV substation Jvari, Georgia

sketch level 3D model for client: EFACEC Vienna
2015
2015

38/10(20) kV substation Ardgeeha, Ireland

secondary design for 38 kV part for client: Energoinvest Reach Active
2015

275/33 kV substation East Kilbride, Scotland

electrical design for connection to 33 kV switchgear for client: Energoinvest Reach Active
2015

HPP Shardara, Kazakhstan

main design and design for construction, drainage of the transformer oil sump for client: Andritz Hydro Germany
2015

HPP Ulu Jelai, Malaysia

design of pipe and cable tray supports for client: Andritz Hydro Vienna
2015

HPP Dariali, Georgia

primary electrical design for 110/10 kV GIS substation for client: Andritz Hydro Vienna
2015

HPP Komani, Albania

design and calculation for reconstruction of – transformer foundations, pipeline route, holding tank, oil separation for client: Andritz Hydro Vienna
2015

110/35/10 kV substation Osijek 2, Croatia

complete electrical design for 110 kV switchyard reconstruction for client: Croatian Transmission System Operator (HOPS)
2015

HPP Orlovac, Croatia

electrical design for 220 kV switchyard reconstruction for client: Croatian Transmission System Operator (HOPS)
2015

110/35/10 kV substation Osijek 2, Croatia

preliminary electrical design for 110 kV switchyard reconstruction for client: Croatian Transmission System Operator (HOPS)
2014
2014

400/220/110 kV substation Pljevlja 2, Montenegro

complete design for extension of one 400 kV bay for client: Siemens AG Vienna
2014

TPP Osijek, Croatia

for-construction electrical design of 110 and 35 kV part for power plant power supply for client: Croatian Electricity Board (HEP)
2014

110/30/10(20) kV substation Rakitje, Croatia

preliminary design solution for reconstruction for client: Croatian Transmission System Operator (HOPS)
2014

HPP Rijeka, Croatia

preliminary design solution for reconstruction of generator part, and 110 kV switchyard, including auxiliary systems for client: Croatian Electricity Board (HEP)
2014

HPP Assiut, Egypt

primary electrical and steel design for 66/11 kV substation for client: Andritz Hydro Vienna
2013
2013

400/110/35 kV substation Brezna, Montenegro

preliminary design – including 400 kV switchyard primary electrical design for phase one – 110/35 kV substation for client: IVICOM CONSULTING GmBh
2013

110/35 kV substation Krnovo, Montenegro

earthing design for client: IVICOM CONSULTING GmBh
2013

HPP Salsipuedes, Panama

primary electrical and steel design for connection to step up transformer, 220 kV and 6.6 kV part for client: Andritz Hydro Norway
2013

HPP La Potra, Panama

primary electrical and steel design for connection to step up transformer, 220 kV and 6.6 kV part for client: Andritz Hydro Norway
2013

110/35 kV substation Pračno, Croatia

for-construction electrical design for client: Croatian Electricity Board (HEP)
2013

110/20 kV substation Funtana, Croatia

for-construction electrical and civil design for client: Croatian Electricity Board (HEP)
2013

110/20 kV substation Tupljak, Croatia

for-construction electrical and civil design for client: Croatian Electricity Board (HEP)
2012
2012

150/20 kV substation Farsala, Greece

primary basic electrical design for client EFACEC Vienna
2012

TPP Osijek, Croatia

preliminary design of new 500 MVA combined cycle gas turbine block, including generator voltage, transformation to 400 kV, 400 kV switchyard and auxiliary power supply for client: Croatian Electricity Board (HEP), IGH
2012

TPP Osijek, Croatia

AC/DC distribution system for PTA2 block for client: Croatian Electricity Board (HEP), Siemens Zagreb
2012

TPP Osijek, Croatia

main AC distribution system PTE reconstruction for client: Croatian Electricity Board (HEP), Siemens Zagreb
2012

TPP Osijek, Croatia

extension of 110 kV switchyard and design of 6.3 kV auxiliary system development, integration and full scope design for client: Croatian Electricity Board (HEP)
2012

110/20 kV substation Nemetin, Croatia

preliminary electrical design for 110 kV and 20 kV part for client: Croatian Electricity Board (HEP)
2012

110/10(20) kV substation Nasice, Croatia

primary electrical design for 10(20) kV switchgear for client: Croatian Electricity Board (HEP)
2012

110/20 kV substation Ilok, Croatia

preliminary electrical design for 110 kV part for client: Croatian Electricity Board (HEP)
2012

HPP Cetin, Turkey

primary electrical design for 400 kV switchyard and connection to generator transformers for client: Andritz Hydro Turkey
2012

150/20 kV substation Florina, Greece

complete electrical design (primary and secondary) and steel structure design for client: EFACEC Vienna
2012

HPP Rijeka, Croatia

energy quality measuring design on 110 kV for client: Croatian Electricity Board (HEP)
2012

HPP Rijeka, Croatia

replacement of instrument transformers on generator voltage design and support for client: Croatian Electricity Board (HEP)
2012

220 kV switchyard Mostar Aluminij, Bosnia and Herzegovina

reconstruction of 220 kV switchyard, primary electrical design for client: Dalekovod / TAL Mostar
2011
2011

110/20 kV substation Bibaj, Kosovo

primary design of switchyard extension for client: KEK Kosovo
2011

HPP Pembelik, Turkey

primary electrical design for 170 kV switchyard and connection to generator transformers for client: Andritz Hydro Turkey
2011

HPP Tatar, Turkey

primary electrical design for 170 kV switchyard and connection to generator transformers for client: Andritz Hydro Turkey
2011

150/20 kV substation Aiginio, Greece

complete electrical design (primary and secondary) and steel structure design for client: EFACEC Vienna
2011

150/20 kV substation Pirgos II, Greece

complete electrical design (primary and secondary) and steel structure design for client: EFACEC Vienna
2011

150/20 kV substation Lygourio, Greece

complete electrical design (primary and secondary) and steel structure design for client: EFACEC Vienna
2011

150/20 kV substation Traianoupolis, Greece

complete electrical design (primary and secondary) for client: EFACEC Vienna
2011

HPP Ilisu, Turkey

primary electrical and steel design for 380 kV and 154 kV switchyard for client: Andritz Hydro Vienna
2010
2010

HPP Boyabat, Turkey

CSE yard primary electrical design for 400 kV equipment, 400 kV cables arrangement and coordination for CSE support design for client: Andritz Hydro Vienna
2010

110/20 kV substation Kutina, Croatia

primary and AC/DC system design for client: Croatian Electricity Board (HEP)
2010

HPP Kindaruma, Kenya

primary electrical design and steel structure design of 132/11 kV switchyard for client: Andritz Hydro Vienna (HEP)
2010

HPP Rijeka, Croatia

replacement of 110 kV circuit breakers in transformer bays, complete electrical design for client: Croatian Electricity Board (HEP)
2010

500/400/220 kV substation Akhaltsikhe, Georgia

steel structure design for client: Siemens AG Vienna
2010

220/6 kV substation Fushe Kruja cement factory, Albania

primary electrical design of 220 kV part, electrical design of 6 kV part, secondary design of DC system, steel structures for client: ABB Zagreb Croatia
2009
2009

HPP Chacayes, Chile

primary electrical design and steel structures for 220 kV switchyard for client: Andritz Hydro Vienna
2009

HPP Siirt and Kurtalan, Turkey

primary electrical design for 170 kV switchyard for client: Andritz Hydro Vienna
2009

HPP Montante, Portugal

primary electrical and steel structures for 220 kV switchyard for client: Andritz Hydro Vienna
2009

HPP Jusante, Portugal

primary electrical design and steel structures for 72 kV switchyard for client: Andritz Hydro Vienna
2009

150/20 kV substation Methana, Greece

electrical design (primary and secondary) of switchyard extension for client: EFACEC Vienna
2009

HPP Alkumru, Turkey

170 kV connecting switchyard primary electrical design for client: Andritz Hydro Vienna
2009

HPP Ambuklao, Philipines

220 kV connecting switchyard primary and secondary electrical design and steel structure for client: Andritz Hydro Vienna
2008
2008

132/33 kV substation Sapugaskanda, Sri Lanka

primary design for extension of 132 kV switchyard for client: Siemens AG Vienna, Ceylon Electricity Board
2008

132/33 kV substation Katunayake, Sri Lanka

primary design for complete substation for client: Siemens AG Vienna, Ceylon Electricity Board
2008

HPP Ambuklao, Philippines

complete electrical design (primary and secondary) for 220 kV switchard for client: Andritz Hydro Vienna
2008

220/110 kV Prizreni, Kosovo

extension for one 110 kV bay, complete electrical design (primary and secondary) for client: Grichting & Valterio, Kosovo Electricity Board
2008

110/35/20 kV substation Rahoveci, Kosovo

complete electrical design (primary and secondary) for client: Grichting & Valterio, Kosovo Electricity Board
2008

110/20 kV substation Dubrova, Croatia

complete secondary design, schematic diagrams for control, protection, metering and signaling for client: Croatian Electricity Board
2008

HPP Bemposta, Portugal

primary electrical design and steel structure design for 400 kV switchyard for client: VATECH Hydro
2008

110/20 kV substation Tupljak, Croatia

main design for complete substation, primary, secondary, civil and steel structure for client: Croatian Electricity Board (HEP)
2007
2007

132/33 kV substation Pannala, Sri Lanka

primary design for complete substation for client: Siemens AG Vienna, Ceylon Electricity Board
2007

132/33 kV substation Deniyaya, Sri Lanka

primary design for complete substation for client: Siemens AG Vienna, Ceylon Electricity Board
2007

132/33 kV substation Bolawatta, Sri Lanka

primary design for complete substation for client: Siemens AG Vienna, Ceylon Electricity Board
2007

132/33 kV substation Aniyakanda, Sri Lanka

primary design for complete substation for client: Siemens AG Vienna, Ceylon Electricity Board
2007

132/33 kV substation Ambalangoda, Sri Lanka

primary design for complete substation for client: Siemens AG Vienna, Ceylon Electricity Board
2007

TPP Sisak, Croatia

main design for complete reconstruction of existing 220 kV switchyard for client: Croatian Electricity Board (HEP)
2006
2006

TPP Osijek, Croatia

preliminary design for extension of 110 kV switchyard, for new block connection for client: Croatian Electricity Board (HEP)
2006

400/110 kV switchyard Bitola 2, Macedonia

extension for one 400 kV bay for interconnection Macedonia-Greece, detail design for execution, primary and secondary for client: Dalekovod, Macedonian Electricity Board
2006

TPP Plomin, Croatia

extension for three new 110 kV bays, detail design for execution, complete electrical and civil work design for client: Dalekovod, Croatian Electricity Board (HEP)
2006

110/20 kV substation Buzet, Croatia

detail design for execution, primary and secondary for client: Dalekovod, Croatian Electricity Board (HEP)
2005
2005

400/220/110 kV substation Vodnjan, Croatia

preliminary design for new substation for client: Croatian Electricity Board (HEP)
2005

TPP Sisak, Croatia

Primary and secondary design for installation of 3 diesel aggregate within TPP switchyard for client: Croatian Electricity Board (HEP)
2005

TPP Sisak, Croatia

preliminary design for connection of new block 250 MVA to 220 kV system for client: Croatian Electricity Board (HEP)
2005

TPP Sisak, Croatia

preliminary design for connection of new block 250 MVA to 220 kV system for client: Croatian Electricity Board (HEP)
2005

400/130 kV substation Stenkullen, Sweden

electrical design for complete outdoor 400 kV switchyard for client: SAG Germany, SVK Sweden
2005

220/66/30 kV substation El Kseur, Algeria

electrical design for extension for client: SAG Germany, Sonelgaz
2005

220/66 kV substation Bouira, Algeria

electrical design for extension for client: SAG Germany, Sonelgaz
2005

220/110/11 kV substation Jangal, Tajikistan

electrical and civil design for substation rehabilitation of transformer bay for client: Grichting & Valterio
2005

220/110 kV substation Novaya, Tajikistan

electrical and civil design for substation rehabilitation for client: Grichting & Valterio
2005

500/220 kV substation Regar, Tajikistan

electrical and civil design for substation rehabilitation for client: Grichting & Valterio
2005

TPP Osijek, Croatia

electrical design for generator voltage 10,5 kV switchgear, protection, synchronizing and automatic transfer for client: Siemens Croatia, Croatian Electricity Board (HEP)
2004
2004

110/20 kV substation Funtana, Croatia

complete electrical and civil design for client: Croatian Electricity Board (HEP)
2004

TPP Cassley, Scotland

power plants protection design for client: Alstom Power
2003
2003

TPP Jertovec, Croatia

preliminary design for reconstruction of 110 kV switchyard for client: Croatian Electricity Board (HEP)
2003

6.3 kV switchgear INA-Sisak, Croatia

detail electrical design for oil refinery plant for client: Siemens Croatia
2003

SPP Mea Hong Son, Thailand

consulting services for client: RWE Solutions Germany, Thailand Electricity Board
2003

Pristina Airport, Kosovo

electrical design for 20 kV and 0.4 kV distribution for client: Ingra, Pristina Airport
2002
2002

500 kV substations Phu Lam, Vietnam

electrical design for 500 kV part extension for client: Alstom, Vietnam Electricity Board
2002

500 kV substations Pleiku Phu Lam, Vietnam

electrical design for 500 kV part extension for client: Alstom, Vietnam Electricity Board
2002

90/15 kV substations Boghe and Kaedi, Mauritania

earthing design for client: Grichting & Valterio, Mauritania Electricity Board
2002

110/20 kV substation Berivojce, Kosovo

electrical and civil design with steel structure design for client: Grichting & Valterio, Kosovo Electricity Board
2001
2001

132/33 kV substations Asser and Sanna, Yemen

electrical design for client: Grichting & Valterio, Yemen Electricity Board
2001

33/15 kV substations Ghedo and Nekempt, Ethiopia

detail design for shield wire scheme distribution for client: SEFAG, Ethiopia Electricity Board
2001

400/220/110 kV substation Mostar 4, Bosnia and Herzegovina

preliminary design for 400 kV switchyard for client: Electricity board of Bosnia and Herzegovina
2001

Podgorica aluminum factory, Montenegro

detail design for MV switchgear for client: Siemens Zagreb
2000
2000

MV switchgear of Medical factory, Croatia

detail electrical design for client: Pliva Medical factory
2000

HPP Rijeka, Croatia

tender documents for protection, control, regulation for three transformer feeders 110/35 kV for client: Croatian Electricity Board (HEP)
2000

HPP Ozalj, Croatia

detail design for auxiliary services for client: Croatian Electricity Board (HEP)
2000

HPP Senj, Croatia

detail design for auxiliary services for client: Croatian Electricity Board (HEP)
1999
1999

HPP Sklope, Croatia

detail design of control panel (complete HPP) for client: Croatian Electricity Board (HEP)
1999

HPP Sklope, Croatia

detail design for auxiliary services (AC and DC) for client: Croatian Electricity Board (HEP)
1999

HPP Vinodol, Croatia

3D model of HPP Vinodol for client: Croatian Electricity Board (HEP)
1999

HPP Vinodol, Croatia

detail design for reconstruction of two transformer bays 110/35 kV for client: Croatian Electricity Board (HEP)
1998
1998

HPP Vinodol, Croatia

detail design for auxiliary services (AC and DC) for client: Croatian Electricity Board (HEP)
1998

HPP Mostar, Bosnia and Herzegovina

detail design for generator voltage equipment for client: Electricity board of Bosnia and Herzegovina
1998

110/35/10 kV substation Odzak, Bosnia and Herzegovina

electrical design for client: Electricity board of Bosnia and Herzegovina
1998

161 kV switchyard of HPS Batman, Turkey

detail electrical design for generator voltage equipment and substation for client: NOEL, Turkey Electricity Board
1997
1997

10(20) kV switchgear of Medical factory Pliva, Croatia

detail electrical design for client: Pliva Medical factory
1997

33/11 kV substation Labuan, Malaysia

detail electrical design for reconstruction of 33/11 kV substation for client: Sabah Electricity Board Malaysia
1997

110/35/10kV substation Orasje, Bosnia and Herzegovina

detail electrical design for client: Electricity board of Bosnia and Herzegovina
1996
1996

33/11 kV substation Nampula, Mozambique

site supervising, site testing and commissioning for client: Alcatel Contracting-Hanover, Mozambique Electricity Board
1996

33/11 kV substation Nampula, Mozambique

detail design for reconstruction/extension of power station with new 33/11 kV substation for client: Alcatel Contracting-Hanover, Mozambique Electricity Board