DASU Projekt 765 kV, Pakistan
Client: GOPA Intec, Germany
Pakistan’s first 765kV substation is situated in Mansehra city and will facilitate power transmission between Dasu HPP and the federal capital, pioneering the use of 765/220kV voltage for the first time. The site is 74 km downstream of the proposed Diamer Bhasha Dam site and 350 km from Islamabad. Upon its completion, the DHPP will have a total installed capacity of 4320 MW with 12 generating units. Total length of 765 kV busbars is nearly 1000 meters.
EIB has executed complete high-level preliminary design for all voltage levels, both primary and secondary systems, delivering technical tender requirements for an EPC contract. Erection of the substation is being finalized currently.